Broke down the boxes and unpacked everything as best I could into the garage. Some stuff is going to immediately go to the storage unit. The windshield and side glass are obvious, but also all of the access panels and baggage door work that won't be needed until tail cone joining.
I'm missing one part - F1003-C. And I'm not thrilled about the weld quality in the center cabin to brace. I can grind it down but it will then lose the powder coating. Maybe Vans will just replace it. [They said to just grind it down and touch it up]
Still some work to do cleaning up and organizing before I dig in.
2/19: got out the label printer and went to work organizing all of my hardware. Got through all of the larger bolts and nuts, as well as organizing all the rivets. Still need to go through the smaller screws and whatnots.